





CAMBRIDGE SCHOOL – ELS
The project consists in the remodeling and expansion of existing buildings in Cambridge College Lima to integrate the Early Learning School (ELS), which is part of a Masterplan for the entire campus.
The main intervention takes place in the circular shaped building (previously for administrative purposes), where the design proposes 7 classrooms that open to an interior green area with a central tree, which turns into the new ELS landmark. In addition, the spaces connect with playing fields and gardens on the outside. The result is a transparency that enriches the interior/exterior connection, which contributes to the pedagogical school system.
Functionally, the design proposes services + storage core every 2 classrooms, in order to comply with the code.
Project Info:
Architecture: Shell Arquitectos
Client: Inspired
Location: Chorrillos, Lima, Perú
Project Status: Construction completed
Site Area: 21,969.39 sqm
Project Area: 582.66 sqm
Number of Stories: 1
Typology: Education
Safety and Evacuation: P&R Arquitectos
Structural: José Antonio Terry Rajkovic
MEP: A+I Consultores
Contractor: Collka SAC
Shell Arquitectos: Alejandro Shell, Rafael Mispireta, Anna Barrón